Use Pre-developed Components to Speed Assembly, Improve Quality
and Save Money
Model
Objects are pre-built, self-contained, smart, model segments
that can be plugged into your models in seconds and save you hours
of modeling time. The same concept that manufacturers have used
to build products can be used to assemble simulation models. Just
as a PC manufacturer wouldn’t think of building a power supply
each and every time they needed one, you shouldn’t have to
build every aspect of a model from scratch. Many elements are common.
We have taken some of these common elements and turned them into
Model Objects that can simply be copied and pasted into your model.
All you have to do is copy, paste and connect what goes into the
object and where the output from the object goes when it’s
done.
Travis Healy, sales manager, said “Model objects help
me to present the software to many different industries, because
I can include concepts that I would never be able to model on my
own. With Model Objects it is as simple as copy and paste.”
See, it’s so simple even a salesman can do it!
There are over 30 Model Objects that help you build models in a
fraction of the time. They work right “out of the box”,
and they’re easy-to-use.
The new Model Objects for this month are listed below:
Dashboard for WIP
The Dashboard object allows you to set levels for the display
meter to change. This object is a tremendous asset during presentations
to illustrate system status.

Note: the text below the indicator can say anything
you would like. Several types of indicators are available.
Set-up time
A new simplified method for modeling set-up time for many different
entities, with distinct setup times. The construct is smart enough
to recognize that if the same entity arrives as the previous then
no setup is needed. This model object is easy-to-use and yet powerful
and simple.

Changing Priorities
In many process situations the priority for getting a resource
changes throughout the day. The emphasis may switch based on time
of day or other factors. The Changing Priorities model object
allows you to quickly impellent a method of changing the work
emphasis based on a variety of conditions.

Heart Beat of arrivals between 8 and 5
Do you need to schedule entities to arrive on a set period but
only during certain times of the day? This Model Object allows
you to control the period between arrivals and the hours of the
day that entities will arrive.

To access the other Model Objects click
here. |